Glossary
-
360 Feedback: Members participate in a program designed to create “full circle” communication with excavators, allowing them to update locate request status via Ontario Dig Authority’s system or website.
-
Buffer zone: A range of distance from actual physical plant that members advise Ontario Dig Authority to include in notifications, varying based on confidence in location accuracy and risk assessment.
-
Cancellation: A locate request that has been cancelled at the excavator’s request and will no longer proceed.
-
Checkbox Clearance: Infrastructure owners can auto-clear notifications based on pre-determined criteria like private property designation, depth, work type, or excavation method.
-
Correction: A change to non-critical information that doesn’t affect excavation extent or require Map Selection redrawing, retaining the original request number with no charge.
-
Damage: “Any impact, stress and/or exposure that results in the need to repair an underground facility due to a weakening or the partial or complete destruction.”
-
Emergency: Loss of service by utility that would cause imminent or significant safety/environmental hazard, requiring infrastructure owner response within two hours.
-
Emergency and priority locate request procedure: Requests only accepted via phone call to Ontario Dig Authority.
-
Excavation: “An operation using equipment or explosives to move earth, rock or other material below existing grade.”
-
Excavator: “Any individual, partnership, corporation, public entity that digs, bores, trenches, grades, excavates, moves or breaks earth.”
-
Excavator locate requests: Received via web or telephone; must include contact name/number, city, street, two nearest intersecting streets, and work type at minimum.
-
Goodnight Report: Optional nightly list of locate requests transmitted in the last 24hrs (free service).
-
Identifying the dig site: Ontario Dig Authority requires sufficient location details, including the work site address (if available) and nearby intersecting streets, to accurately position the dig site in the GIS mapping system.
-
Locate Request: “Means notification by an excavator of proposed work to Ontario Dig Authority. It may be a standard request, priority request or emergency request.”
-
Locate request categories: Prioritized and numbered sequentially as Advanced/Project Work, Standard, Priority, or Emergency based on desired work commencement date.
-
Locates: “Means markings on the ground made by the owner or operator of underground infrastructure indicating the location of its underground infrastructure; and providing to the Excavator a written document.”
-
Maintaining your equipment: Underground Infrastructure Owners must decide on compatible receiving equipment location/type and maintain it in good working order.
-
Mapping your service area: Members provide Ontario Dig Authority with information portraying their coverage area via digital GIS files, hard copy maps, or municipal confirmation.
-
Member contact information: Members provide billing/administration, operations, and mapping contact details and must notify Ontario Dig Authority of changes.
-
Member of Ontario Dig Authority: Includes every Ontario municipality, Hydro One, Ontario Power Generation, gas distributors/transmitters, electricity distribution operators, entities under Oil, Gas and Salt Resources Act, and persons owning infrastructure crossing public rights-of-way.
-
Notification: Ontario Dig Authority determines member notification status and informs excavators which members will be notified, providing “All Clear” where appropriate.
-
Notification service: Basic service where infrastructure owners provide location information and Ontario Dig Authority transmits notifications for all dig activity in pre-defined areas.
-
Operator: “A person who does not own the infrastructure in question but otherwise is responsible for its day-to-day operation.”
-
Person: “Any individual or legal entity, public or private.”
-
Priority 0: Deferred emergency used only at the discretion of Ontario Dig Authority. Members will do their best to complete locates in a timely manner, however, they still have up to 5 or 10 business days to complete their response, depending on the type of request (single address request or advanced request).
-
Private lines: Not covered by Ontario Dig Authority members; separate locates required for pool heater lines, barbeque gas lines, and secondary service lines.
-
Project Work: Excavation comprising at least two properties with separate municipal addresses or properties where at least one lacks a municipal address; 10 business days for completion.
-
Receiving notifications: Members receive notifications via FTP, SFTP, email, or phone calls for emergencies.
-
Standard: Single address requests reasonably expected to commence within 30 days; members complete locates or provide clearance within 5 business days.
-
Subsequent notification categories: Correction, Update, and Relocate notifications sent after original notification based on additional excavator information.
-
Suppressions and Alternate Locate Agreements: Special arrangements managing notifications based on contractor ID for work not requiring traditional field locates.
-
Underground Infrastructure/Facility/Plant: “A cable, line, pipe, conduit, or structure used to gather, store, or convey products or services.”
-
Update: Critical information changes affecting location/extent requiring new request number; treated as new request for billing.
-
Validating and Mapping your Underground Network: Underground Infrastructure Owners must also validate their mapping coverage at least every 180 days to ensure accurate, up-to-date information.
-
Web requests: User-friendly requests submitted at excavator’s convenience allowing specific dig location mapping; may require Ontario Dig Authority audit.